|
PROJECT INFORMATION |
|
Project Name | : | Kista Tramway | |
Location | : | Stockholm, Sweden |
|
SCOPE |
|
Design And Construction Of 6.8 Km Double-Track Tram Line | ||
Tunnel With Trenches | ||
3 Bridges | ||
Retaining Structures | ||
8 Tram Stops | ||
8 Technical Building | ||
4 Rectifier Stations | ||
3 Combined Buildings | ||
Best Works (Track, Electricity, Signaling (Traffic), Telecommunication) Optional Depot For 12 Tram Cars |